Dry lining cost per m² on a London commercial job depends on the system, the board specification, wall heights, the number of openings and junctions, the level of finish and how easy the site is to work. TPLS Interiors Ltd prices every dry lining package against the drawings and the spec, so the rate reflects your building rather than an average. Director-led, London-based, trading since 2006.

TL;DR

A dry lining rate covers studs and track or furring, boards, insulation where specified, fixings, tape and jointing, and labour, plus site overheads. The biggest variables are the partition system and its fire or acoustic performance, the number of board layers, wall height, deflection heads, openings and the finish level. Price work, day rates and supply and fix are three different ways of pricing the same wall, so compare like for like. Call 0204 572 0878.

Key Takeaways

  • Fire and acoustic performance drive the system, and the system drives the cost
  • Board layers, wall height and deflection heads change the rate more than wall length
  • Openings, corners and junctions add labour that a simple m² figure hides
  • Tape and jointing finish level should be stated on every quote
  • Price work, day rate and supply and fix are not interchangeable, so check which you are comparing

The questions we get most often about dry lining are how much it costs per m² and whether price work or day rate is better value. Both have the same honest answer: it depends on the wall. A single-layer partition in an open floor and a two-hour fire-rated, high-acoustic wall up to a deep soffit are both “dry lining”, but they are not the same job and they will never be the same price.

So instead of printing a rate that would mislead, this guide explains what goes into a dry lining price, which factors move it most, and how to read the quotes you are comparing.


What Goes Into a Dry Lining Cost per m²

Every dry lining price, however it is presented, is built from the same parts:

  • Framing. Metal studs and track for partitions, or metal furring and brackets for wall linings. Stud size and centres are set by height and performance.
  • Boards. Standard, fire, acoustic, moisture-resistant or impact boards, in one or more layers each side.
  • Insulation. Acoustic mineral wool in the cavity where the spec calls for it.
  • Heads and junctions. Deflection heads, abutments, corners, T-junctions and interfaces with ceilings and glazing.
  • Openings. Door sets, borrowed lights, service penetrations and the framing around them.
  • Finish. Tape and jointing to the specified level, ready for decoration.
  • Labour and site overheads. Setting out, installation, access equipment, waste, protection and supervision.

If one quote looks much cheaper than the others, the first thing to check is which of these it has left out. Tape and jointing and deflection heads are the two we see missing most often.

Dry lining and metal stud partitions installed by TPLS Interiors Ltd in London

Metal stud partitions going up on a London commercial fit-out

Commercial interior with finished dry lined walls and suspended ceiling

Finished dry lining ready for decoration


The Factors That Move the Price Most

Factor Why it changes the rate
System and performance A fire-rated or high-acoustic partition needs specific studs, boards, layers and insulation to match the tested system
Board layers Two layers each side is roughly double the boarding and fixing time of one
Wall height Taller walls need heavier studs, closer centres and more access equipment
Deflection heads Needed where the slab above can move, and they take time to detail properly
Openings and junctions Every door, corner and abutment adds framing and cutting
Finish level A higher level of tape and jointing for critical lighting takes longer than a standard finish
Board type Moisture-resistant, impact and acoustic boards cost more than standard plasterboard
Access and programme Central London logistics, occupied buildings and out-of-hours working
Existing building Out-of-plumb walls and uneven soffits in older buildings add setting out and packing

In our experience the system choice and the number of openings move the price more than anything else. Long straight runs of standard partition are the most economical dry lining you will build. Short runs full of doors, corners and service penetrations are the least.


How the System Choice Affects Cost

Most commercial partitions are built to a manufacturer system such as British Gypsum GypWall, Knauf or Siniat, and the system is chosen to hit a fire resistance period and an acoustic target. Those targets come from the design team. Once they are set, the system follows, and with it the stud gauge, board type, number of layers and insulation.

That is why it pays to get the performance requirement right before the package is priced. A partition specified at a higher acoustic or fire rating than the room needs costs more for no benefit. One specified below what the room needs costs more again when it has to be rebuilt. If you are weighing dry lining against wet plaster on a refurbishment, our article on why dry lining suits commercial buildings covers the programme side of that decision, and our guide to insulated dry lining covers thermal linings.

Larger structural framing jobs, such as infill walls on new builds, fall under steel frame systems rather than standard partitions and are priced differently again.


Price Work, Day Rates and Supply and Fix

These terms come up constantly and they are often confused.

  • Price work pays the installer by the quantity completed, usually per m² of board or per linear metre of partition. It rewards speed, which is fine as long as quality is checked.
  • Day rate pays for time on site regardless of output. It suits small, awkward or unpredictable work where measuring quantities is hard.
  • Supply and fix is a full package price including materials, labour, finishing and site overheads. It is what most main contractors and clients are looking for on a commercial job.

A dry liner day rate and a supply and fix rate per m² are measuring completely different things, so they cannot be compared directly. On a commercial package we price supply and fix, itemised, so you can see what is in it.


How to Get an Accurate Dry Lining Quote

Send these together and the price will come back firm rather than as a range:

  • Floor plans with partition types marked, and a partition schedule if there is one
  • Fire and acoustic requirements for each partition type
  • Floor-to-soffit heights and ceiling heights
  • Door schedule and any glazed screens
  • Finish level required for tape and jointing
  • Programme, working hours and site address

If the spec is still being developed, we can price alternatives side by side. Where budget is the sticking point on a larger fit-out, we also offer project finance.


How to Compare Dry Lining Quotes

Before looking at the totals, check that each quote includes:

  • The same system, by manufacturer and system reference
  • The same board type and number of layers
  • Insulation where specified
  • Deflection heads and head details
  • Framing around openings
  • Tape and jointing to a stated finish level
  • Access equipment, waste and protection
  • A clear list of exclusions

A low price that leaves out the finish or the heads is not a saving. It is a variation waiting to happen.


Need a dry lining package priced?

Send us the plans and partition schedule and we will come back with an itemised price.

Call 0204 572 0878Submit Tender Documents


Working with TPLS Interiors

TPLS Interiors has been installing suspended ceilings, dry lining and partitions across London since 2006. Founded by Tomasz Platek and Lukasz Swider, whose initials give the company its name, it is still director-led on every project.

We price dry lining the same way every time: against the drawings, by system, with tape and jointing and exclusions stated. We also take over packages from other contractors that have stalled, so we see first-hand what happens when a cheap quote leaves things out.

Our material partners include British Gypsum, Knauf and Siniat.


Frequently Asked Questions

Q: How much does dry lining cost per m² in London?

It depends on the system, the board specification, the wall height, the number of openings, the finish level and the site. A long run of standard partition sits at the economical end, while a tall, multi-layer fire-rated acoustic wall with lots of openings sits at the other. Send the drawings and we will price it properly.

Q: Is price work or day rate better for dry lining?

Price work suits large, measurable areas. Day rates suit small or awkward work where quantities are hard to pin down. On a commercial package, a full supply and fix price is usually the clearest because it includes materials, labour, finishing and overheads in one number.

Q: Does a dry lining quote include tape and jointing?

It should, but not always. Check that the quote states tape and jointing and the finish level. It is one of the items most often left out of low quotes.

Q: Is dry lining cheaper than plastering?

On most commercial projects dry lining is quicker because there is little or no drying time, which shortens the programme and lets following trades start sooner. The overall cost comparison depends on the spec, so it is worth pricing both if the design is open.

Q: What information do you need to price dry lining?

Floor plans with partition types, fire and acoustic requirements, heights, the door schedule, the finish level and the programme. With those we can give a firm price rather than a range.

Q: Can you take over a dry lining package that has stalled?

Yes. We regularly pick up packages from other contractors part way through. We survey what is there, price the remaining work and plan it around the original handover date where that is achievable.


Get an itemised dry lining price

Plans and partition schedule in, firm price back.

Get a Quote

Or call 0204 572 0878

LS

Lukasz Swider

Lukasz co-founded TPLS Interiors in 2006 alongside Tomasz Platek. He oversees every project personally and has delivered ceilings, dry lining and partitions across more than 500 commercial sites in London for main contractors, developers and corporate occupiers.

✓ Fully insured
✓ RAMS provided
✓ CSCS-qualified teams
✓ Director-led

Disclaimer: This page explains the factors that affect dry lining cost in general terms. It is not a quotation. Every project is priced individually against its drawings, specification, programme and site conditions. Always confirm system performance against the manufacturer current documentation before specifying.