TPLS Interiors Ltd delivers dry lining across London commercial and industrial projects. On most commercial programmes dry lining has replaced wet plaster, mainly because of time. This page covers why, what it means for the finish, and where plaster still makes sense. Director-led, London-based, trading since 2006.
TL;DR
Dry lining fixes plasterboard to a frame, battens or the wall itself, then the joints are taped and jointed for decoration. Wet plaster is applied in coats and has to dry. On commercial programmes dry lining wins on time because there is little drying period, it creates a void for services, and it can hit specific acoustic and fire performances with tested build-ups. Wet plaster still suits some refurbishment of traditional buildings and areas needing a very hard surface. Call 0204 572 0878.
Key Takeaways
- Dry lining removes most of the drying time that wet plaster adds to a programme
- Framed or battened dry lining creates a service void, which wet plaster does not
- Acoustic and fire performance come from tested build-ups, not just the board
- Most cracking in dry lining comes from movement or poor jointing, both preventable
- Wet plaster still has a place in some heritage and high-impact areas.
Contents
The question we get asked is usually framed as cost. In practice the decision on commercial and industrial work is driven by programme, services and performance, and cost follows from those.
What Is Actually Different
| Dry lining | Wet plaster | |
|---|---|---|
| Method | Board fixed to frame, battens or wall, joints taped and jointed | Plaster applied in coats to the wall |
| Drying time | Short, jointing compound only | Significant, depends on thickness and conditions |
| Services | Void behind board for cables and pipes | Chasing into the wall |
| Performance | Acoustic and fire from tested build-ups | Depends on background wall |
| Moisture into building | Low | High, has to dry out |
| Surface hardness | Good, impact boards available | Very hard |
Dry lining installation, London commercial project
Dry lining and suspended ceiling installation
Why Programme Usually Decides It
On a commercial job the critical path rarely sits with the plaster itself. It sits with everything that cannot start until the walls are dry. Wet plaster puts moisture into the building, and decoration, flooring and joinery wait for it to dry out.
Dry lining removes most of that wait. Board goes up, joints are taped and jointed, and once the jointing compound is dry the surface is ready for decoration. On a multi-floor fit-out that difference accumulates across every floor.
It also suits phasing. A dry lining package can follow the M&E first fix floor by floor without bringing water into areas that are already being finished.
Does Dry Lining Crack?
It can, and when it does there is usually a clear reason. The common causes:
- Structural movement. Partitions fixed rigidly to a soffit that deflects will crack at the head. Deflection heads exist for this reason and should be specified where the structure moves.
- Joints in the wrong place. Board joints lined up with door frame corners are a classic crack line. Board layout should avoid it.
- Poor jointing. Missing tape, too little compound or rushed drying.
- Building drying out. Boarding onto a wet background or in a building still drying out leads to movement.
All four are preventable at detailing and installation stage. Good tape and jointing is the difference between a wall that stays clean and one that needs remedial work after handover.
Commercial and Industrial Specifics
Industrial and warehouse buildings bring their own requirements. Higher walls need taller stud systems or appropriate framing, impact-resistant boards suit areas with trolleys and forklifts nearby, and moisture-resistant boards suit wash areas.
Office and retail work leans more on acoustic separation and fire compartmentation, which come from tested partition build-ups. Our soundproof partition walls page covers acoustic partitions.
Where wet plaster still makes sense: some refurbishment of traditional buildings, where matching the existing wall finish and breathability matters, and areas needing a very hard monolithic surface. We will say so when it is the better option.
Dry lining package to price?
Send the drawings and programme and we will price it and flag any detailing issues up front.
Working with TPLS Interiors
TPLS Interiors has been delivering suspended ceilings, dry lining and partitions across London since 2006. Founded by Tomasz Platek and Lukasz Swider, whose initials give the company its name, it remains director-led on every project.
We work as a subcontractor to main contractors and directly with project managers, architects and commercial occupiers, and we also step in on stalled packages where a programme needs recovering.
We work on commercial and larger residential projects. We do not take on small works or single room jobs.
Frequently Asked Questions
Q: What is the difference between dry lining and plastering?
Dry lining fixes plasterboard to a frame, battens or the wall, then the joints are taped and jointed for decoration. Plastering applies wet plaster in coats directly to the wall, which then needs to dry. Dry lining is faster and creates a service void.
Q: Is dry lining faster than plastering?
On most commercial programmes, yes, mainly because it avoids the drying period wet plaster needs before follow-on trades can start.
Q: Does dry lining crack?
It can if there is structural movement without a deflection head, joints in the wrong place, poor jointing, or boarding onto a building that is still drying. All of these are preventable with correct detailing and installation.
Q: Can dry lining be acoustic or fire rated?
Yes, through tested build-ups combining board type, layers, stud system and insulation. The performance comes from the whole build-up, not the board alone.
Q: Is dry lining suitable for industrial buildings?
Yes. Taller stud systems, impact-resistant boards and moisture-resistant boards are used for warehouses, industrial units and wash areas.
Q: When is wet plaster the better choice?
Some refurbishment of traditional buildings, where matching existing finishes and breathability matters, and areas needing a very hard monolithic surface.
Need a dry lining package priced?
Get a quote for your London commercial project.
Or call 0204 572 0878
Lukasz Swider
Lukasz co-founded TPLS Interiors in 2006 alongside Tomasz Platek. He oversees every project personally and has delivered ceilings, dry lining and partitions across more than 500 commercial sites in London for main contractors, developers and corporate occupiers.
✓ RAMS provided
✓ CSCS-qualified teams
✓ Director-led
Share This Article